Responses and Submissions
On behalf of it’s members FFBRA responds to the permit applications and consultations for the Balcombe well site and beyond.
- Application for Section 288 Statutory Review
- FFBRA Objection to WSCC/045/20: Remove drilling fluids and carry out an extended well test included the following documentation
- FFBRA Additional Objection to Hydrological Risk Assessment – February 2020
- FFBRA commissioned Lower Stumble Exploration Site Balcombe – Technical Review of Hydrogeological Risk Assessment – February 2020
- FFBRA Objection to WSCC/071/19: Remove drilling fluids and carry out an extended well test. This proposal is a two-stage activity: , 1) Pumping out previously used drilling fluids to ascertain any oil flow (up to 4 weeks) , 2) Should oil be seen to flow, an extended well test would be carried out over a period of 3 years – October 2019
- FFBRA Response to Application MO/2018/0444 SCC Ref 2017/0215, Brockham Wellsite – July 7th, 2018
- FFBRA Response to the Environmental permit consultation RH17 6JH, EPR/AB3307XD/V005 submitted by Cuadrilla Balcombe Ltd – June 4th, 2018
- FFBRA Submission to the WSCC Mineral Plan Consultation – March 9th, 2018
- FFBRA Objection to WSCC/040/17/BA: “Temporary permission for exploration and appraisal comprising the flow testing and monitoring of the existing hydrocarbon lateral borehole along with site security fencing, the provision of an enclosed testing flare and site restoration” – November 30th, 2017
- FFBRA Response to EA Consultation Standard Permitting – June, 14th 2015
- FFBRA Submission to Environmental Audit Committee – December 31st, 2014
- FFBRA Community Evidence to the Lords Select Committee on the Economic Impact on UK Energy Policy of Shale Gas and Oil – January 21st, 2014
- FFBRA Comments on Public Health England Health Review of the Potential Public Health Impacts of Exposures to Chemical and Radioactive Pollutants as a Result of Shale Gas Extraction – October 28th, 2013